Schools M&E Refurbishments

Ealing Schools
London
Go back

BTU have an ongoing relationship with LB Ealing with regard to provision of M&E Services for Schools in the Borough.
In that time we have undertaken a diverse range of schools project which represent a major investment by Ealing Council. Most of them were for the refurbishment of boiler plant or water systems replacement. BTU has worked closely with the Council and has delivered many of the projects during term time, minimising disruption to the school timetable, noise and dust, local traffic and movement of staff and pupils around the school.
Where services were required to be interrupted, we managed this in consultation with the school and introduced systems and solutions to ensure seamless running of the schools activities. All projects were delivered on time, on budget and in scope.

The most relevant tasks performed included:
St Anne’s School – Basement Boiler Replacement - Value £113,722.01
West Acton School - New potable water and sprinkler supplies – Value £113,940.00
John Perryn Primary School - Hall Heating Works – Value £29,883.92
Tudor Primary School - Hot and Cold Water Installation to North Block – Value £142,481.01
Windmill School - Water Hygiene Works – Value £125,953.63
Coston Primary – Wood Building Boiler Replacement – Value £121,404.32
arrow-left linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram